SPECIAL POST
Today I went up in a plane with Lori and Leah to take aerial pictures of the school. Guy was our pilot from Mitchinson Flying Service. He did a great job considering it was his "second time flying the plane". Lori took the pictures through a window she opened herself (which I am sure went against every fibre in her being).
Check out these photos!
Monday, September 28, 2009
Friday, September 25, 2009
Day 86
Tuesday, September 22, 2009
Day 83
I have gotten in the habit of updating this blog every Friday but I thought I would post another entry today because of the obvious progress being made on the roof system over the multi-purpose auditorium and fine arts area.
The roof system over the auditorium
Here you can see the peaked trusses over the auditorium
Friday, September 18, 2009
Day 79
Another milestone today as the final lift of cement is poured into the exterior walls around the fine arts room and the multi-purpose auditorium. This means that the rest of the trusses should start to be installed this coming Tuesday.
As you can see from the pictures, while the Nienhuis crew is working on pouring the exterior walls, the framers were busy sheeting the roof and building the facia to match the existing building.

The top portion of the walls of the auditorium are braced for the final lift of cement

A view of the truss system from the fine arts room

The sheeting and fascia line up perfectly with the existing building
As you can see from the pictures, while the Nienhuis crew is working on pouring the exterior walls, the framers were busy sheeting the roof and building the facia to match the existing building.

The top portion of the walls of the auditorium are braced for the final lift of cement

A view of the truss system from the fine arts room

The sheeting and fascia line up perfectly with the existing building
Friday, September 11, 2009
Day 72
There was lots of activity today. The roof trusses were being installed on the completed sections of the cement walls while the next "lift" of cement was being poured into the other wall sections. With the crane and the cement pump truck operating at the same time, even the area above the construction site looked busy.

It was a day for aerial acrobatics as the crane manoeuvered trusses while the cement pump was operating

The trusses of the roof system are going up quickly

A view of the framing work through a window opening

It was a day for aerial acrobatics as the crane manoeuvered trusses while the cement pump was operating

The trusses of the roof system are going up quickly

A view of the framing work through a window opening
Friday, September 4, 2009
Day 65